Completion Accessories
Engineered for Reliable Well Completion
Enertech Completions provides high-quality Completion Accessories designed to ensure reliable well performance and operational efficiency in oil and gas applications. Engineered for durability and precision, our accessories support smooth completion operations while withstanding demanding downhole conditions. With a focus on quality, safety, and performance, we deliver solutions that help optimize production and enhance well integrity.
Completion accessories
Tap any item to explore the full specification
Multi-port sliding mechanism for selective zone activation and diversion. Wireline operated.
Sizes: Available for tubing sizes 2 3/8″ to 7″
Provide a profile or receptacle for installing, locating and retrieving wireline-retrievable flow control and isolation devices.
Sizes: Available for tubing sizes 2 3/8″, 2 7/8″, 3½″ and 4½″
Flexible connectors that accommodate thermal and mechanical movement. Prevent stress concentration in the tubing string.
High-temperature wells and dynamic production environments. Extends overall equipment life.
Installed at the lower end of the tubing string, the Wireline Re-Entry Guide (WEG) provides a smooth, guided entry path for wireline and slickline tools returning from the casing annulus into the tubing bore. The profiled entry guide directs intervention tools back into the tubing, reducing the risk of tool hang-up and improving intervention efficiency.
Configurations: Bell Type (enlarged entry profile), Mule Shoe (tapered guide profile) and Half Mule Shoe (directional guide profile)
Heavy-wall tubing accessories that protect completion equipment and tubing strings from erosional wear caused by high-velocity fluid flow and turbulence. Installed at strategic locations within the completion string, they act as a sacrificial wear section, preserving the integrity of the tubing and extending the operational life of the completion system.
Sizes: Wide range of sizes, lengths, materials and premium thread connections
Installed within the completion string to provide a bypass flow path when downhole pressure and temperature gauges are deployed. Precision-engineered perforations allow fluid communication while maintaining structural integrity, with a total flow area equivalent to the tubing internal diameter to minimise flow restriction.
Sizes: Various tubing sizes, materials, lengths and thread combinations, including API and proprietary connections
Installed within the completion string, the Pump-Out Sub provides a temporary pressure barrier that enables hydraulic setting of packers and other downhole tools. After activation, the internal plug or ball seat is sheared and pumped from the tubing, restoring full bore access for production and intervention operations.
Configurations: Solid plug and ball-seat designs with configurable shear values, premium metallurgy options and completion-specific connections
