Completion Accessories

Engineered for Reliable Well Completion

Enertech Completions provides high-quality Completion Accessories designed to ensure reliable well performance and operational efficiency in oil and gas applications. Engineered for durability and precision, our accessories support smooth completion operations while withstanding demanding downhole conditions. With a focus on quality, safety, and performance, we deliver solutions that help optimize production and enhance well integrity.

Completion accessories

Tap any item to explore the full specification

Function

Multi-port sliding mechanism for selective zone activation and diversion. Wireline operated.

Benefits
Flexible zone access
Reduced rig time
Scalable design
Uses
Multi-interval completions
Selective injection
Isolating during workover operations

Sizes: Available for tubing sizes 2 3/8″ to 7″

Function

Provide a profile or receptacle for installing, locating and retrieving wireline-retrievable flow control and isolation devices.

Benefits
Reduced workover costs
Increased operational flexibility
Improved reservoir management
Uses
Flow control
Water shut-off
Temporary suspension

Sizes: Available for tubing sizes 2 3/8″, 2 7/8″, 3½″ and 4½″

Function

Flexible connectors that accommodate thermal and mechanical movement. Prevent stress concentration in the tubing string.

Benefits
Vibration damping
Thermal relief
Equipment protection
Uses

High-temperature wells and dynamic production environments. Extends overall equipment life.

Function

Installed at the lower end of the tubing string, the Wireline Re-Entry Guide (WEG) provides a smooth, guided entry path for wireline and slickline tools returning from the casing annulus into the tubing bore. The profiled entry guide directs intervention tools back into the tubing, reducing the risk of tool hang-up and improving intervention efficiency.

Benefits
Reliable tool re-entry
Reduced intervention time and risk
Improved performance in deviated and horizontal wells
Protection of downhole tools and completion equipment
Full-bore accessibility for intervention tools
Robust construction for demanding well environments
Uses
Wireline and slickline intervention operations
Tubing End Locator (TEL) operations
Sample bailing applications
Well logging and monitoring
Intelligent completions
Vertical, deviated and horizontal wells

Configurations: Bell Type (enlarged entry profile), Mule Shoe (tapered guide profile) and Half Mule Shoe (directional guide profile)

Function

Heavy-wall tubing accessories that protect completion equipment and tubing strings from erosional wear caused by high-velocity fluid flow and turbulence. Installed at strategic locations within the completion string, they act as a sacrificial wear section, preserving the integrity of the tubing and extending the operational life of the completion system.

Benefits
Protects tubing and completion equipment from erosion and washout
Increases completion reliability and service life
Reduces maintenance, intervention and replacement costs
Heavy-wall construction for enhanced wear resistance
Full-bore internal diameter minimises flow restriction
Suitable for high-rate, HPHT, H₂S and CO₂ service
Uses
Above and below landing nipples
Adjacent to sliding sleeves and flow control devices
Above and below subsurface safety valves
Near gas lift and side pocket mandrels
Around expansion joints and other accessories
Wells with high flow rates or erosive production

Sizes: Wide range of sizes, lengths, materials and premium thread connections

Function

Installed within the completion string to provide a bypass flow path when downhole pressure and temperature gauges are deployed. Precision-engineered perforations allow fluid communication while maintaining structural integrity, with a total flow area equivalent to the tubing internal diameter to minimise flow restriction.

Benefits
Effective bypass flow path for downhole monitoring systems
Maintains pressure and temperature communication to downhole gauges
Engineered perforations preserve joint strength and integrity
Flow area equivalent to tubing ID reduces flow restriction
Wide range of sizes, materials and thread configurations
Compatible with API and premium thread connections
Field-proven design manufactured to industry standards
Uses
Completions with permanent downhole pressure gauges
Completions with permanent downhole temperature gauges
Intelligent completions needing communication past monitoring equipment
Oil, gas and water injection wells with downhole surveillance
Production strings needing unrestricted flow around gauge mandrels
Conventional and premium systems with API or proprietary connections

Sizes: Various tubing sizes, materials, lengths and thread combinations, including API and proprietary connections

Function

Installed within the completion string, the Pump-Out Sub provides a temporary pressure barrier that enables hydraulic setting of packers and other downhole tools. After activation, the internal plug or ball seat is sheared and pumped from the tubing, restoring full bore access for production and intervention operations.

Benefits
Reliable hydraulic packer setting
Full bore access after pump-out
No wireline or coiled tubing retrieval required
Reduced completion time and operational cost
Customisable shear pressure settings
Suitable for HPHT and challenging well environments
Uses
Hydraulic production packer setting
Completion string pressure testing
Sliding sleeve activation
Temporary tubing isolation
Deepwater and HPHT completions
Production, logging and intervention-ready completions

Configurations: Solid plug and ball-seat designs with configurable shear values, premium metallurgy options and completion-specific connections